Before starting the Huaquan generator, a series of preparations need to be made to ensure its safe operation. The following are detailed preparation steps:
1、 Environmental inspection
It should be ensured that the places where Huaquan generators are used have good ventilation, are away from flammable and explosive materials, and are prohibited from being used in locations that do not meet safety standards. At the same time, it is necessary to check whether there is enough space around for the generator to dissipate heat and ventilate, in order to avoid equipment damage caused by overheating.
2、 Huaquan generator fuel and lubricating oil inspection
1. Fuel: Clean fuel should be used and checked for sufficient fuel. For gasoline tanks, it is necessary to add fuel of 90 # or above; For diesel tanks, it is important to ensure that the diesel is of good quality, free from impurities and moisture.
Lubricating oil: Pull out the oil level gauge to check if there is a shortage of lubricating oil. If there is a shortage, add it to the specified "static full" scale line to ensure that the oil level is between 2/3 of the low and high scales, and cannot be too little or too much.
3、 Inspection of cooling water and antifreeze for Huaquan generator
Before each start-up, it is necessary to check whether the cooling water or antifreeze in the diesel engine water tank meets the requirements. If it is missing, it should be filled up. This helps prevent the generator from being damaged due to overheating during operation.
4、 Huaquan Generator Cable and Electrical System Inspection
The use of cables should comply with standards and should not be damaged, aged, or have poor contact. Before starting, the position of the cable should be checked to avoid being stepped on or tripped by vehicles or personnel. At the same time, it should be ensured that the electrical system wiring is correct, all connecting parts are secure, the brushes are normal, the pressure meets the requirements, and the grounding wire is in good condition.
5、 Generator and diesel engine inspection
Check for potential faults in the generator and diesel engine, and promptly eliminate any issues. Before starting, it is necessary to turn off the output air switch of the generator to avoid starting with load. At the same time, for generator sets with clutches, the clutch should be disengaged.
6、 Huaquan Generator Start Preparation
Before starting, the selection switch of the generator should be set to manual mode, and the initial start switch should be set to the "stop" position. Prepare the start-up tools and necessary safety protective equipment.
Before starting the Huaquan generator, it is necessary to carefully prepare the above-mentioned work to ensure the safe and stable operation of the generator.
More information on Huaquan Electric Power:http://www.baidufadianji.com/